Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Flatonia
1. New Booster Pumps at Existing Water Plant No. 3; 2. Yard Piping; 3. Electrical & Controls.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
County of Maui
Remove and dispose of existing pumps; and furnish, deliver, and install three (3) new sulzer/johnston, or approved equal, turbine pumps for water treatment plant.
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
County of Maui
Close: Dec 4, 2025
Remove and dispose of existing pumps; and furnish, deliver, and install three (3) new sulzer/johnston, or approved equal, turbine pumps for water treatment plant.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Folsom
Provide condition assessment for the water treatment plant and water booster pump station facilities.
Posted Date
Nov 3, 2025
Due Date
Dec 19, 2025
Release: Nov 3, 2025
City of Folsom
Close: Dec 19, 2025
Provide condition assessment for the water treatment plant and water booster pump station facilities.
AvailableBurnt Cabin Rural Water District
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
Posted Date
Nov 13, 2025
Due Date
Dec 5, 2025
Release: Nov 13, 2025
Burnt Cabin Rural Water District
Close: Dec 5, 2025
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
AvailableCity of Vinton
Construction of the water treatment plant improvements project. The project consists of the construction of a new water treatment plant structure, aerators, clearwells, booster pumps, horizontal pressure filters, chemical feed equipment, piping, sitework, electrical and controls, and related work as shown on the drawings and within the specifications.
Posted Date
Oct 10, 2025
Due Date
Dec 11, 2025
Release: Oct 10, 2025
City of Vinton
Close: Dec 11, 2025
Construction of the water treatment plant improvements project. The project consists of the construction of a new water treatment plant structure, aerators, clearwells, booster pumps, horizontal pressure filters, chemical feed equipment, piping, sitework, electrical and controls, and related work as shown on the drawings and within the specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.