Naval Facilities Engineering Command, Southeast
Design and construction services of the new prefabricated DLA Fuel Testing Lab; The project includes construction of a new prefabricated building fuel testing lab adjacent to the existing buildings and infrastructure and within close proximity of the existing fuel storage facility, the project shall include design and work provisions for all civil, structural, mechanical, plumbing and electrical infrastructure requirements to incorporate the new facility to the site.
Release
Jul 11, 2024
Close
Aug 21, 2024