Logo

starbridge

Book a Demo
RFPs/N043--580-25-1-5063-0100 Steam Pipe Scanning

N043--580-25-1-5063-0100 Steam Pipe Scanning

Department of Veterans Affairs;G.V. (Sonny) Montgomery

Summary

One-time Steam Pipe Inspection located in a tunnel using a crawler robot. The existing Steam Pipe is servicing the campus and outer buildings. The Steam Pipe is located inside the steam tunnel that connects the boiler plant to the outer buildings and provides steam for heating hot water, domestic hot water, and steam for equipment. The steam pipe has developed several leaks, and the extent of these leaks need to be determined so repairs can be made. Steam Pipe Inspection: The contractor shall provide all labor, equipment, material, and supervision to inspect approximately 2000 feet of existing steam pipe and condensate return pipe located in an underground tunnel. The steam pipe runs from the boiler plant (building 105) to building 110. The inspection shall be completed using an advance robotic crawler that has the ability to provide photos and video of the existing conditions and leaks. The contractor shall not need access inside the steam tunnel for the inspection. The facility will reduce the steam down to 10% prior to the inspection. In the event of a failure of the rover or equipment, if it can t be removed without accessing the steam tunnel then it will be removed at a later date. At the completion of the inspection, the contractor shall provide a detailed report of the findings to include photos, videos, locations of the failed areas and leaks. The contractor shall provide recommendations for repairs.

Files

No files

Details

Release

Nov 21, 2024

Close

Nov 26, 2024

Contacts

Source