Logo

starbridge

Book a Demo
RFPs/Multi-building Mechanical Deferred Maintenance - UCSB Library Chiller Plant Replacement, Bldg. 525 (Project B) *Re-Bid*

Multi-building Mechanical Deferred Maintenance - UCSB Library Chiller Plant Replacement, Bldg. 525 (Project B) *Re-Bid*

University Of California Santa Cruz

Summary

Work consist of demo of the existing chiller, cooling tower and pumps, provide two new 600 tr centrifugal chillers, associated cooling towers, condenser pumps and vfd's, piping for chilled, condenser and industrial water, control valves and associated hvac controls, electrical panel board, power all equipment, testing, adjusting, balancing and commissioning, provide new exhaust fan, modify refrigerant monitor system.

Files

No files

Details

Release

-

Close

Jul 08, 2025

Contacts

Source

Get a Free RFP Download