City of San Diego
Work includes 510 LF median barrier fence; 1 LS traffic guardrail sdsd sdm-130; 580 LF additional curb and gutter removal and replacement; 580 SF sidewalk removal and replacement; 1,650 SF additional sidewalk removal and replacement; 10,921 LF median curb and gutter(type b-2); 1 EA commercial concrete driveway; 7 EA curb ramp (type a) with detectable warning tiles; 22 EA curb ramp modified (type c1) with detectable warning tiles; 4 EA curb ramp modified (type c2) with stainless steel detectable warning tiles. See outside link.
Release
Jun 27, 2024
Close
Oct 17, 2024