Retrieving RFP details
Release
Close
City of Auburn
Seeks bids for the miscellaneous pump station improvements project.
East Cherry Creek Valley Water And Sanitation District
The Work consists of construction of replacement of surge anticipator valves at the East Cherry Valley Water and Sanitation District, Western Booster Pump Station. Demolition of two surge anticipator angle valves, one pump control valve, electrical control panels, and associated piping, conduit, and wiring. Installation of two new globe surge anticipator valves, including piping, fittings, instrumentation, pipe supports, and appurtenances for fully functional surge control systems. Installation of a new pump discharge check valve and associated piping. Electrical and control improvements including new control panels, ethernet cabling, conduit, and network racks. Repair and reconstruction of existing facilities affected by the Work, and incidentals for complete and usable facility.
City of Beeville
Project will include installation of One (1) 300kW Generator and One (1) 400A Automatic Transfer Switch at the FM 351 Booster Pump Station. The Cleveland Booser Pump station will include installation of One (1) 200kW Generator and One (1) 300A Automatic Transfer Switch
Collier County
Work consist of demolition, asphalt driveway, yard piping, tank drain assembly, pump building interior piping assembly, vertical turbine pumps, sodium hypochlorite pump skid and chemical storage, caustic pump skid and chemical storage, generator, fuel system improvements, mechanical HVAC improvements, electrical improvements, structural improvements, 500,000 gallon ground storage tank, bypass operations.
Release
Sep 28, 2025
Close
Oct 30, 2025