Retrieving RFP details
Release
Close
Maryland State Highway Administration
Work includes milling, patching, and resurfacing asphalt pavements, and line striping at various locations. This work may also include bridge approaches, and deep patching.
Maryland State Highway Administration
Milling, patching, and resurfacing asphalt pavements at various locations.
Township of Brick
Multi-location roadway resurfacing.
Ohio Turnpike and Infrastructure Commision
Work includes: Removal by milling of two (2) inches of existing asphalt pavement in the right, center, and left lanes of the mainline, removal by milling of two (2) inches of existing asphalt in the left and right shoulder, mill and fill of the Sonic Nap Alert Pattern in the left and right shoulder, resurfacing of the pavement and shoulders to the thickness specified in the drawings, installation of raised pavement markers and permanent pavement striping and/or other pavement markings, upgrading of guardrail, installation of SNAPs, and temporary traffic control. See attached file.
Release
Sep 27, 2025
Close
Nov 13, 2025