Retrieving RFP details
Release
Close
City of Saint Peters
Provide slope failure repair. The project will remediate the slope failure and replace the existing failed slope with light stone revetment. Traffic and pedestrian control; 0. 3 acre clearing, grubbing, scarifying; contractor surveying and staking; erosion and sediment control; control of water; 1300 cy excavation, benching slope, hauling and disposal (removal of sloughed material); 4000 sf mirafi 160n filter fabric; 60 cy modot type 2 rock ditch liner; 1690 cy modot/msd 7 light stone revetment; 40 sy modot type 5 aggregate; site restoration.
Arkansas Division of Building Authority
Main street mall redevelopment project.
Colerain Township
The project consist of corrective work where slope failure has occurred.
City of Los Angeles
Traffic control and signs, Project surveying and installation of survey monuments, Clearing and grubbing, including trimming of trees (if necessary) to facilitate construction and removal of vegetation and tree stumps. Dispose all vegetation, Remove, haul away, and dispose existing erosion control measures at the site (e.g. sandbags, rope, and plastic sheeting).
Release
Oct 14, 2025
Close
Nov 04, 2025