Retrieving RFP details
Release
Close
New York State Office of Parks, Recreation and Historic Preservation
Metropolitan recreation center dehumidification system reconstruction.
B085-124M
zip
Naval Undersea Warfare Center (NUWC)
Seeking to lease a Desiccant Climate Controlled Unit (DCCU) system to provide dry and tempered process air for conditioning various spaces used for industrial applications. The system must include multiple DCCU’s, a chiller, chilled water pump, chilled water hose manifolds, hose assemblies as well as the associated onboard controls to operate both the chilled water system and DCCU’s. The intent of the chiller, pump, hose assemblies, manifolds and ancillary components is to establish a temporary chilled water system which serves all of the DCCU’s pre-cooling and post-cooling coils. All equipment conveying air to and from the industrial space must be pre-wired with remote E-Stop capability in order to provide a means to secure airflow in the event of an emergency response. Each DCCU and Chiller must be frame/skid mounted and meet the lifting & handling requirements as defined in the specification. See attached file.
Chickamauga City School District
Install of HVAC systems, install of dehumidification system, duct work, insulation and ceiling work, and HVAC controls.
City of New York
Provide construction management services for the reconstruction of the main sewage pump system, rehabilitation of the final settling and aeration tank systems, and replacement of the process air blowers.
Release
Oct 27, 2025
Close
Nov 18, 2025