Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Delaware
Project work involves the extension of merrick blvd as a boulevard section for approximately 0.39 miles from cambridge road to troy road, including the reconstruction of 0.50 miles of troy road and construction of a single lane roundabout. The improvements also include full depth pavement, curb and gutter, concrete median, straight curb, sidewalk, multi-use path, drives, storm sewer, water works, traffic control, landscaping and roadway lighting.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Delaware
Project work involves the extension of merrick blvd as a boulevard section for approximately 0.39 miles from cambridge road to troy road, including the reconstruction of 0.50 miles of troy road and construction of a single lane roundabout. The improvements also include full depth pavement, curb and gutter, concrete median, straight curb, sidewalk, multi-use path, drives, storm sewer, water works, traffic control, landscaping and roadway lighting.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
City of Delaware
Close: Dec 18, 2025
Project work involves the extension of merrick blvd as a boulevard section for approximately 0.39 miles from cambridge road to troy road, including the reconstruction of 0.50 miles of troy road and construction of a single lane roundabout. The improvements also include full depth pavement, curb and gutter, concrete median, straight curb, sidewalk, multi-use path, drives, storm sewer, water works, traffic control, landscaping and roadway lighting.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Fort Bend County Mud 2
Provide construction of water, sanitary, & drainage facilities extension phase 1.
Posted Date
Dec 4, 2025
Due Date
Dec 18, 2025
Release: Dec 4, 2025
Fort Bend County Mud 2
Close: Dec 18, 2025
Provide construction of water, sanitary, & drainage facilities extension phase 1.
AvailableCity of Chula Vista
The City of Chula Vista requests Statements of Qualifications from qualified consulting firms to prepare preliminary engineering, environmental analysis, and final design plans for the F Street Promenade Phase 1 corridor (Bay Blvd to Broadway). The work includes preliminary and final design, environmental analysis, right-of-way support, and construction support; the project is funded by federal Active Transportation Program, TransNet, and local funds.
Posted Date
Oct 24, 2025
Due Date
Dec 17, 2025
Release: Oct 24, 2025
City of Chula Vista
Close: Dec 17, 2025
The City of Chula Vista requests Statements of Qualifications from qualified consulting firms to prepare preliminary engineering, environmental analysis, and final design plans for the F Street Promenade Phase 1 corridor (Bay Blvd to Broadway). The work includes preliminary and final design, environmental analysis, right-of-way support, and construction support; the project is funded by federal Active Transportation Program, TransNet, and local funds.
AvailablePolk County
Consists of the Thompson Nursery Road extension. The limits of construction begin at SR 540 and US 17 and extend 1.9 miles to the southeast and ends south of Rifle Range Road (CR 655) and Eloise Loop Rd. Drainage; flexible paving; grading; guardrail; pavement marking; roadway signing; traffic signal; hot plant-mixed bituminous courses; electrical work; and sidewalk.
Posted Date
Nov 21, 2025
Due Date
Jan 21, 2026
Release: Nov 21, 2025
Polk County
Close: Jan 21, 2026
Consists of the Thompson Nursery Road extension. The limits of construction begin at SR 540 and US 17 and extend 1.9 miles to the southeast and ends south of Rifle Range Road (CR 655) and Eloise Loop Rd. Drainage; flexible paving; grading; guardrail; pavement marking; roadway signing; traffic signal; hot plant-mixed bituminous courses; electrical work; and sidewalk.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →