Retrieving RFP details
Release
Close
Western Mun Water Dist Of Riverside
To provide construction services for the Meridian Building Climate Control Project). The Project involves the installation and integration of advanced HVAC systems to enhance building climate control. The District intends to retain a A and/or B Licensed General Contractor (“Applicant/Bidder”) to perform construction services.
Chitimacha Tribe of Louisiana
Provide climate resiliency/stormwater management, phase 1 project.
Macomb County
Project includes approx. 7,425 CYD of sediment from offline ponds, 6,550 FT of coir log embankments , 760 feet of rootward revetments,1 acre of tree plantings, 75 CYD of riprap ,y 3. 5 acres of native seeding.
Cass County
DESIGN-BUILD. Design and construction of a new office building. The proposed facility will measure approx. 100 ft by 60 ft. This project includes design-build services for a single-story office building, encompassing design, engineering, site preparation, utilities, and construction. The building will include office space, meeting rooms, restrooms, and support infrastructure.
Release
Oct 02, 2025
Close
Nov 21, 2025