Retrieving RFP details
Release
Close
Town of Keenesburg
Roadway improvements on Nelson Ave and Ash St, culvert headwall and wingwalls at the entrance of Memorial Park, curb and gutter for parking area, and Memorial Park phase 1 improvements.
Borough of Allendale
75 SY DGA Base Course, 8" Thick; 26 ton HMA 19M64 Base Course; 9 Ton HMA 9.5M64 Surface Course; 10 SY Concrete Pad, 4" Thick, If and Where Directed; 10 SY Concrete Sidewalk, 4" Thick; 473 SY Brick Pavers; 26 SY Brick Paver Driveway, Reinforced; 2 SY Detectable Warning Surface; 340 LF of 9"X20" Concrete Vertical Curb; 194 LF Traffic Marking Lines, 24"; 56 SF Regulatory and Warning Signs; 6 unit Decorative Sign Post; 5 unit Bench, If and Where Directed; 2 unit Bike Rack, If and Where Directed; 300 SY Topsoil Spreading, 4" Thick; 300 SY Fertilizing and Seeding, Type A; 300 SY Straw Mulching.
City of Osawatomie
The scope of work included in this Phase 1: Demolition, sidewalk, New bathrooms, New kitchen, New entry doors, New cabinets (by others), New flooring (entry way only), New MEP.
City of Watertown
Work consists of How Park Phase 1 Playground Renovations.
Release
Oct 15, 2025
Close
Nov 07, 2025