Retrieving RFP details
Release
Close
City of Toledo
Construct a new 230 SF bathroom on an existing concrete foundation, with the following: 6" depth split face masonry block with a standing seam metal roof; ADA and building code compliant; widen door openings in the foundation to accommodate a 36" wide door; utilize existing pipe penetrations and water source for plumbing.
Toledo Memorial Field Bid Docs 10-3-25
Eagle Pass Independent School District
Project includes the remodel of food service delivery area.
City of Hillsboro
DESIGN-BUILD: Provide Progressive Design-Build services for the Ronler Fire Bathroom Remodel.
Brookhaven School District
Work includes replacement of softball field lighting and poles.
City of East Providence
Construction of the pierce field police substation. See outside link.
Release
Oct 16, 2025
Close
Oct 31, 2025