Project will consist of the construction of a ±600 LF collector type roadway, which will provide connection to existing public streets. Work includes construction of a single span arch structure, modular block retaining walls, and channel widening improvements.
City of Crystal Lake
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
Lubbock County Sheriff's Office
Woodrow road - phase II.
Sumter County Soil Conservation District
Furnishing all materials, equipment, and labor necessary to construct the pinnacle court drainage improvements phase 2a & 2b consisting approx 1,640 LF of new RCP storm drainage and 16 drainage boxes, and miscellaneous demolition, utility relocation, and fine grading to facilitate the project.
Release
Oct 29, 2025
Close
Dec 16, 2025