City Of Statesboro
This work will include reconfiguring the road to a one-way thoroughfare, installing traffic calming measures, ensuring all private drives along the roadway conform to standard commercial driveways, and installing of a new storm pipe network to improve drainage. Additionally, the project requires adding an entrance to Parks and Recreation parking lot. Work will include but is not limited to the following: clearing, excavating, setting grade, installing subgrade materials, paving, concrete forming, concrete pouring, concrete pipe installation, grading and dressing of job site, and traffic striping.
202501_supportingdocs_PE-61650-NONST-2025-000000037-2025-01-31_14_28_10-79dbcf44-89e1-4731-b96a-cf9f20cc4c62
Release
Jan 31, 2025
Close
Mar 13, 2025