ASC/PKWRM
System design completed, building 143 the contractor shall design the materials handling system; modular cabinets mini-mezzanine system, building 143; pallet racks system, building 143; mini-order picker vehicle system, building 143. See outside linked file.
Release
Jul 16, 2024
Close
Aug 16, 2024