City of New Florence
1. Replacement of 12 existing 48" sanitary manholes. 2. Replacement of existing pumps and above-grade valve structures at two (2) existing pump stations, electrical and site work at two (2) existing pump stations, AND Rehabilitation of one (1) existing 72-inch wet well and one (1) existing 96-inch wet well by applying a structural epoxy liner OR CIPM.
Release
May 29, 2025
Close
Jun 17, 2025