City Of Rock Hill
The work consists of construction of was storage tanks, a dewatering facility, a thermal dryer facility, filtrate pump station and flow meter vault, a primary sludge storage tank, solids odor control facility and installation of was transfer pumps and was storage blowers, and all associated yard piping, civil, electrical, and instrumentation work.
bulk
zip
Release
Sep 30, 2024
Close
Oct 30, 2024