Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Lafayette Parish School System
Approximately 15,530 Square Foot new construction gymnasium , built to LHSAA regulation standards on an existing middle/ high school campus. The facility is designed to accommodate 800 occupants, with support spaces for coaches, students, athletes, and general public. Minor site work and demolition to the existing campus to accommodate the new facility. Sidewalks and metal canopies as shown in the construction documents.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City Colleges of Chicago
Build-out STEM Laboratories at College.
Posted Date
Oct 29, 2025
Due Date
Dec 8, 2025
Release: Oct 29, 2025
City Colleges of Chicago
Close: Dec 8, 2025
Build-out STEM Laboratories at College.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Lafayette Parish School System
Complete waterproofing and cast stone restoration on the main building on campus.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
Lafayette Parish School System
Close: Dec 18, 2025
Complete waterproofing and cast stone restoration on the main building on campus.
AvailableEugene School District 4J
Seismic improvements to the structure of the main gym at ATA, along with associated removal and patching of finishes required for the installation of structural work. The project also includes installation of new roofing over the existing roof and associated flashing replacement.
Posted Date
Oct 24, 2025
Due Date
Dec 11, 2025
Release: Oct 24, 2025
Eugene School District 4J
Close: Dec 11, 2025
Seismic improvements to the structure of the main gym at ATA, along with associated removal and patching of finishes required for the installation of structural work. The project also includes installation of new roofing over the existing roof and associated flashing replacement.
AvailableHarmony Public Schools - Houston North
Work includes site demolition, earthwork, vapor barrier, concrete forming & accessories, concrete reinforcing, concrete for building, concrete for sidewalks and driveway, steel joist framing, steel roof decking, cold-formed metal framing, interior stud framing, sheathing, millwork, thermal and moisture protection, roof and deck insulation, roofing, hollow metal doors & frames, plastic laminate doors, overhead coiling doors, aluminum framed storefronts, aluminum windows, door hardware, glazing, safety & security window film, drywall, stucco, tiling, acoustical ceilings, resilient flooring: vct, base, and accessories. Gym flooring and striping, tile carpeting, see outside link.
Posted Date
Nov 4, 2025
Due Date
Dec 12, 2025
Release: Nov 4, 2025
Harmony Public Schools - Houston North
Close: Dec 12, 2025
Work includes site demolition, earthwork, vapor barrier, concrete forming & accessories, concrete reinforcing, concrete for building, concrete for sidewalks and driveway, steel joist framing, steel roof decking, cold-formed metal framing, interior stud framing, sheathing, millwork, thermal and moisture protection, roof and deck insulation, roofing, hollow metal doors & frames, plastic laminate doors, overhead coiling doors, aluminum framed storefronts, aluminum windows, door hardware, glazing, safety & security window film, drywall, stucco, tiling, acoustical ceilings, resilient flooring: vct, base, and accessories. Gym flooring and striping, tile carpeting, see outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →