Retrieving RFP details
Release
Close
Lincoln Public Schools
Southeast Activities Complexes Maintenance Building.
Lincoln Public Schools
Construction indicated on the drawings and specifications, included but not limited to the following: Construct new 2,400 SF pre-engineered metal building with finished heated storage. Grading for site, new building and parking area. Overhead and walk doors. Office area with millwork. New electrical installed. Plumbing for future water and waste service. New fence with 30’ slide gate. Concrete and limestone parking area.
City of West Des Moines
Fence repairs at sports complexes. Work includes, but is not limited to: Installing new chain-link/wire mesh fabric at specified heights and gauges. Retying, tightening, leveling, and straightening existing fence fabric. Removing and resetting posts and footings where heaved or misaligned. Repairing, adjusting, or replacing gates (single, double/drive, maintenance). Restoring disturbed ground and daily site cleanup.
County of Morris
Replacement of floor finishes at all complexes on an as needed basis.
Release
Oct 19, 2025
Close
Nov 06, 2025