City of Joliet
The proposed construction consists of demolition of the existing wet well, valve vault, controls, generator and generator pad. New pre-cast polymer concrete wet well with two (2) submersible pumps, valve and meter vault, controls and natural gas fueled emergency power generator will be installed to replace the existing equipment. Work shall also include site piping with connections to existing gravity sewers and the forcemain. Proposed site improvements include grading and fill, asphalt repair, bollard installation and restoration of the site, as well as other miscellaneous items of work.
Lois Place Lift Station Rehabilitation
zip
Release
Feb 06, 2025
Close
Feb 27, 2025