Retrieving RFP details
Release
Close
Charlotte County
Lift station grounds maintenance.
document
Wells Branch Mud
Lift Station Maintenance project generally consists of the rehabilitation of a 40 year old wet well/dry well wastewater lift station with a capacity of 450 gpm. The project includes replacement of the electrical and controls, coordination of new electrical supply power lines, services drops, meters and all other conduit and wiring necessary to operate and maintain the lift station. The project will also include a new generator, new perimeter security fence, and replacement of the existing wet well/ dry well access hatches and safety equipment. The lift wet well will require temporary by-pass pumping for cleaning and relining of the wet well concrete walls and all interior dry well coating.
Volusia County
WOrk consists of maintenance, repair, or replacement of lift stations.
Seneca County
Annual Sanitary Sewer Pump Station Maintenance.
Release
Oct 16, 2025
Close
Nov 05, 2025