Retrieving RFP details
Release
Close
Tohopekaliga Water Authority
Furnishing and delivering all pumps, pump bases, pump base plates (refer to toho detail toho-32), pump power cables (minimum 60-foot length), control panel, floats, guide rails, float hanger (one per station), gaskets or seals, transducers, spare parts, and ancillary items necessary to ensure a fully functional lift station pump and panel system
IFB-25-045 LS 8P 98K
Tohopekaliga Water Authority
Supply and delivery of pumps, pump base plates, floats, transducers, control panel, and other miscellaneous items for S057.
Fort Pierce Utilities Authority
Lift station control panel
City of Ammon
Installation of a new lift station, manholes, sewer pipe to relocate and eliminate an existing sewer lift station. The city will provide the manholes, lift station manhole, sewer pipe and valve vault for the contractor to install. The city will be responsible for the generator, installation of the pumps, valve control panel and electrical service.
Release
Oct 05, 2025
Close
Nov 06, 2025