Logo

starbridge

Book a Demo
RFPs/Laurel Avenue Ne Waterline Replacement

Laurel Avenue Ne Waterline Replacement

City of Salem

Summary

Work consists of 778 LF 8" Ductile Iron Pipe - Class 52, Trench Excavation, and Crushed Rock Backfill with Restrained Joints; 19 EA 1" Water Service - Long (Longer than 15 LF); 1 EA 2" Water Service; 1 EA Fire Hydrant Assembly (Including Mainline Tee); 10 EA 8" 45° Bend (ALL MJ); 1 EA Sanitary Sewer Lateral Replacement and Reconnection for Conflict with Water Main; 700 SF Sidewalk, 4" of PCC Over 2" of 1"-0 Aggregate Base; 277 SF Sidewalk, 6" of PCC Over 2" of 1"-0 Aggregate Base; 798 LF Temporary Trench Patch.

Files

Laurel Avenue Ne Waterline Replacement

zip

Details

Release

Apr 16, 2025

Close

May 13, 2025

Contacts

Source

Get a Free RFP Download