Logo

starbridge

Book a Demo
RFPs/Laketon Road Reconstruction

Laketon Road Reconstruction

Borough of Wilkinsburg

Summary

Work include 4,805 SY demolishing and removal of existing roadway; 4,805 SY grade existing subgrade to level; 300 SY perform subgrade base repair, as directed by borough engineer; 4730 SY subbase installation. Includes geotextile fabric and 6" depth of penndot no. 2a coarse agreement material; 4,730 SY subbase installation. Includes geotextile fabric and 6" depth of penndot no. 2a coarse agreement material; 4,730 SY superpave asphalt mixture design wma binder course, pg 64-22, 0.0 to 0.3 million esal s, 25mm mix (4" depth) (base repair, as directed).

Files

No files

Details

Release

-

Close

Apr 28, 2025

Contacts

Source

Get a Free RFP Download