Summary
This project replaces the existing CT system in CT SCAN 1-457 at First Floor of KOP (Koman Family Outpatient Pavilion) with GE’s Next Generation CT System. This project requires upgrades to existing building elements and systems, including new HVAC equipment (two new fan coils), a new breaker in the main electrical room, and a new feeder from the main electrical room to the CT room. Additionally, new interconnection cables and a new conduit between equipment elements. The existing equipment closet must be enlarged to accommodate the new equipment, which will involve new partition walls and ceiling and lights modifications. Existing finishes will be matched, floor and wall patching are included in the scope of work. The University seeks Contractors with demonstrated experience in the installation of CT Scan systems, HVAC upgrades, electrical power upgrades and low voltage structured cabling systems within an operational facility. Specific experience requirements include: work within a hospital with limited staging area, work within an operational facility, renovations/ upgrades to existing outdated space.