Project consist of replace all existing underground steel gas piping on this campus with polyethylene gas piping, approx 900 LF of underground gas piping. Removal of asphalt and/or concrete to bore new gas lines on campus. Reconnect all underground p/e piping to the existing above ground steel gas piping. Perform a full air test on all newly installed underground gas piping. All new gas piping to be inspected by memphis-shelby county code enforcement. Replace all asphalt and/or concrete removed from the boring of the new underground gas piping. See attached file.
IFB 120224DWA Kingsbury MS and HS Underground Gas Line Replacement
zip
Release
Nov 08, 2024
Close
Dec 02, 2024