Retrieving RFP details
Release
Close
Brookhaven National Laboratory (Contractor)
Provide furnish and install a comprehensive Electronic Access Control System across four (4) dormitory buildings. The project encompasses a total of Two-Hundred Twenty-Six (226) dorm rooms plus associated lobby areas. The intent of the project is to establish a fully functional, centrally managed access control solution that improves security, operational efficiency, and resident management capabilities.
Key+Card+Access+Control+System+(No+Substitutions)
zip
Brookhaven National Laboratory (Contractor)
Provide TPS-mobile turbo pumping system, no equivalents or substitutions.
City of Santa Monica
Work includes service and repair of airport security gates and access control system. Provide support, maintenance, repair, programming, and training for the following equipment at santa monica airport: 14 cs brivo 5000wg/6000wg control panels chamberlain liftmaster/sentex cpwr wiegand receivers, hid 5xxxx series readers and keypads; 2. Access control system maintenance deliver monitoring and preventive maintenance services for brivo systems security gate access control on a quarterly basis, including:system testing, modifications and upgrades, new installations, supply of necessary components. See outside link.
Brookhaven National Laboratory (Contractor)
Provide vacuum desiccator with diaphram vacuum pumps and accessories - no substitutions. Qty 1 SKU: EXSICA2W Vacuum Desiccator Extra Wide 31.3 Liters. Qty 1 SKU: N840G Laboboport Diaphragm Vacuum Pumps Collection 34-I/min - 6mbr. Qty 1 SKU: OD6-PU10M - Acessories for Vacuum Desiccator Hose Pipe Tube Kit. See attached file.
Release
Oct 23, 2025
Close
Nov 05, 2025