City and County of Honolulu
Project include demolition of existing structures and construction of new dewatering building. Work includes construction of multi-level building for new dewatering equipment, auxiliary systems, and area for biosolids storage bins. Site improvements include grading, utilities, and modifications to the existing roadway. Installation of two (2) air compressors. Installation of 10-ton bridge crane. Installation of three (3) self-contained polymer feed units and flow meters. Installation of hydrogen sulfide and carbon monoxide level monitors. See attached file.
Kailua Regional Wastewater Treatment Plant (WWTP) New Dewatering Building
zip
Release
Mar 27, 2025
Close
Jun 06, 2025