Chesapeake Public Schools
Work includes roof retrofit using a ketone ethlyene ester (kee) roofing system over gypsum cover board. The assembly will be installed over the existing roof. Roof drain piping support directly adjacent to new and existing roof drains.
Jolliff Middle School Roof Replacement
zip
Release
Apr 09, 2025
Close
Apr 30, 2025