Clackamas County
Project consists of modifications to an existing pump station, an existing diversion structure, and at an existing wastewater treatment facility. The WORK at the IT2 pump station includes establishing erosion and sediment control; establishing a bypass of the pump station; demolition of a section of existing 20” yard piping; demolition of existing asphalt and concrete in the station parking lot; demolition of storm sewer piping; installation of new permanent force main intertie piping and vault; installation of a new permanent pigging port, flow meter and vault; new surge valve and expansion of existing surge vault; new yard piping and valves; new storm sewer piping and two manholes; new pump, valves and process piping; see attached file.
Release
Nov 26, 2024
Close
Dec 19, 2024