Logo

starbridge

Book a Demo
RFPs/Installation of HDPE Fuseable Pipe and Water Troughs for the Holden Springs Pipeline/Trough Project 2024

Installation of HDPE Fuseable Pipe and Water Troughs for the Holden Springs Pipeline/Trough Project 2024

State of Utah

Summary

The Utah Division of Wildlife Resources (UDWR) and the Bureau of Land Management (BLM) are seeking a contractor to install approximately 23,700 feet of HDPE Fuseable Pipe (2" and 1.5" SDR 11, minimum 200 PSI) and set up four rubber tire water troughs and one metal water trough in Millard County, Utah. The contractor must provide all necessary materials, including the pipe and rubber tire troughs, and handle all aspects of installation, including fusing the pipe, setting the troughs, and potentially creating an overflow pond. The project is scheduled between September 10th and October 31st, 2024. Contractors must have prior experience with HDPE pipe installation and the required equipment. Bids are to be submitted as a lump sum.

Files

1256752-1676774610Attachment B Scope of Work

pdf

Details

Release

Sep 10, 2024

Close

Oct 31, 2024

Contacts

Source

Get a Free RFP Download