Retrieving RFP details
Release
Close
Omaha Metropolitan Utilities District
Work consists of 550 LF 12" DIRJ Pipe; 1 EA Connection Type A-4; 1 EA Install and remove 12" chlorine tube; 1 EA Furnish and install air relief, valve, and vault: Install 12" gate valve; 1 EA Type 5 Hydrant: Furnish and install pipe, reducer, fittings, and hydrant; install hydrant for Type 5 Hydrant (end of main - reducer).
ProcurementDownload
zip
Omaha Metropolitan Utilities District
Work consists of 3560 LF 8" DIPJ Pipe; 1 EA Tees with 8" throughway; 55 LF Augering for 8" pipe; 2 EA Furnish and install air relief, valve, and vault: Install 8" gate valve; 3 EA Furnish and install adjustable valve box and valve; install 8" gate valve; 9 EA Type 1 Hydrant: Furnish and install tee, pipe, fittings, valve, adjustable valve box, and hydrant; install valve and hydrant for a Type 1 Hydrant, (standard).
City of Garland
Elevated storage tank phase 2. Work includes 234 SY remove and replace a 6" reinforced concrete and #57 stone sub-base floor from the interior of the tank tower, 42 SY remove and replace 4" thick concrete sidewalk/ mow strip on exterior tank base, 1145 LF install 6' 9 gauge by 2" galvanized industrial mesh chain link fence with 3 strand barb wire top and pedestrian gate. See outside link.
Omaha Metropolitan Utilities District
Work consists of 1560 LF 12" DIPJ Pipe; 330 LF 12" DIRJ Pipe; 1 EA Tees with 12" throughway; 2 EA 12" and larger plugs or caps; 1 EA Connection Type A-4; 1 EA Connection Type C-2; 1 EA Furnish and install air relief, valve, and vault: Install 12" gate valve; 1 EA Temporary Type 5 Hydrant: Furnish and install pipe, reducer, fittings, and hydrant; install hydrant for Type 5 Hydrant (end of main - reducer).
Release
Oct 29, 2025
Close
Nov 11, 2025