Retrieving RFP details
Release
Close
Omaha Metropolitan Utilities District
Install the lakewood booster pump station and water mains. The new Lakewood Booster Pump Station will be a packaged pump station with the pumps and instruments included. Huffman Engineering will provide a new PLC pump control panel, PLC Programming, Citect Scada programming at Systems Control and onsite checkout and startup. A new Citect SCADA screen will be created at MUD Systems Control to allow for remote monitoring and control. The pump booster station will have 3 pumps, but one pump will be hardwired with local controls with no connection to the pump control panel and there will be no monitoring. Communication from the PLC to the 2 new Pump VFDs will be via Profibus.
City of Weeping Water
Construction of installation of a new 8" PVC water main along F street and rehabilitation of the booster pump house at the water tank site with new pumps and piping.
Lauderdale County
The Project consists of a new elevated water tower, booster pump station and associated water main piping.
Erie City Water Authority
Provide general/mechanical and electrical construction for the improvements to the booster pump station.
Release
Oct 02, 2025
Close
Oct 30, 2025