Retrieving RFP details
Release
Close
Orange Beach Water Sewer And Fire Protection Authority
The construction of approximately twenty-one (21) 6" Insertion Valves, seven (7) 8" Insertion Valves, four (4) 10" Insertion Valves, site restoration, and all other related appurtenances.
00111-2018
Adv-for-Bids-Insertion-Valve-2-CMOB250047
Tennessee Department of Finance and Administration
WTSP Life Safety System Upgrades - Phase 2 Fire Alarm Upgrades.
City of Waycross
Wastewater Treatment Facility Upgrades – Phase 2 is described briefly as follows: In general, construction shall consist of conversion of sludge digester #2 to an aerobic digester. Removal of the digester roof, complete clean out, and installation of new mixing and aeration equipment along with slabs, piping, electrical, and controls for a working aerobic digester. Additional plant work shall include a new stairwell, plant by-pass pumping connection, and rehabilitation of the primary clarifier influent lines.
City of Philadelphia
Work include ramp lighting upgrades.
Release
Oct 15, 2025
Close
Nov 20, 2025