U.S. Army Corps of Engineers, Rock Island
The work includes, but is not limited to, construction of aquatic nuisance species (ANS) deterrents: Automated Barge Clearing Deterrent (ABCD); Bubble Curtain Deterrent (BCD); and Acoustic Deterrent; support facilities and access roads, excavation within the Short Engineered Channel (SEC) to include, but not limited to: demolition; clearing, grubbing, and stripping; underwater excavation of rock and sediment; fabricated building systems; electrical work; mechanical work; plumbing work; structural work; architectural finishes and specialties; TAB and commissioning; directional drilling; concrete work; sheet pile work; fabrications; emergency, interior and exterior lighting work; cybersecurity work; electronic security systems; earthwork; floating dock and boat ramp construction; asphalt paving; riprap placement; chain-link fencing and gates; salvage materials for reinstallation; generator installation; site and building signage; surveying; instrumentation and monitoring; and site restoration.
Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A
zip
Release
May 16, 2025
Close
Aug 14, 2025