Jacksonville Electric Authority (JEA) - Procurement Dept
The Substation SJRPP T1 project builds a new substation to the east of the existing SJRPP switchyard. The new substation will include a 230/26kV T1 power transformer, along with 4 26kV bays, three of which are for the new 251, 252, and 253 breakers. One bay will be for a cap bank. A new 9T1W transmission breaker will be installed in the existing SJRPP switchyard. This project will also construct a new control house. 5 panels will be installed on this project. The contractor will be responsible for the installation of the panels, along with the control cable terminations. The contractor will tap into existing SJRPP switchyard water and sewer, and run water and sewer lines to new substation control house. The existing fence will be removed and relocated, existing gate to be removed. Existing curb, area lights, sprinklers to be removed One water and One sewer main will be installed along Power Park Rd, to New Berlin, and connected to existing infrastructure. (2) 10’x16’ manholes, (3) 8’x12’ manholes, along with conduits, will be installed for distribution. 8 lightning masts, along with 64 area lights will be added. New cable trench will be routed from the new substation control house and connected into the existing SJRPP switchyard cable trench.
(IFB) SJRPP Substation and T1 with 9T1W Transmission Breaker Installation
zip
Release
Apr 17, 2025
Close
Jun 03, 2025