Retrieving RFP details
Release
Close
City of Houston
Seeking a contractor for the subway efficiency infrastructure improvements project at airport. This project aims to improve accessibility, upgrade interior finishes, replace de-watering pumps, enhance safety and air quality, and modernize the subway to current standards.
IAH Subway Efficiency Infrastructure Improvements
zip
City of Houston
Provide remedial rehabilitation to the skyway automated people mover (APM) superstructure and substructure. 1 LS mobilization/ demobilization; 1 LS traffic control; 1,750 SF surface repair (running beam coating: coating system of a crack bridging and waterproofing product on running beams and deck); 36 sf surface repair (nosing repair: contractor shall use a saw cut (or other tools) to square damages in the running guideway beam at the joints or intersections. Repair the area using rapid- set mortar and epoxy mortar); 10 SF surface repair (grout repair: contractor shall remove the damaged grout under steel connections on the skyway. Following preparing the area, form and pour the area sing rapid-set mortar). See attached files.
City of Houston
Provide remedial rehabilitation the skyway automated people mover superstructure and substructure.
Pinedale Water Sewer And Fire Protection Authority
The project consists of making improvements to the water distribution infrastructure to include construction of an elevated water storage tank, booster pumping station, and a new purchase meter connection
Release
Aug 01, 2025
Close
Nov 13, 2025