Retrieving RFP details
Release
Close
City of Humboldt
The Project generally consists of construction of Drainage Study. The Project includes the following types of work: 1. Installation of driveway culverts, drainage structures, concrete driveways, and asphalt paving. 2. The allotted time for construction is 120 calendar days.
Advertisement+for+Bids
City of Beaufort
Seeking bids from qualified engineering contractors to complete a drainage study of the pigeon point neighborhood area resulting in a capital improvements drainage plan. This study will identify and quantify drainage infrastructure deficiencies, evaluate existing and future flooding, and develop conceptual alternatives to address identified flooding and develop a plan for implementing drainage improvements.
Denton Purchasing and Materials Manager
Provide comprehensive management study for the city water, wastewater, solid waste, drainage, and electric utilities.
Passaic County
Work includes on-call drainage projects; installation of various sizes & types of drainage pipe; installation of various drainage structures; installation of new concrete sidewalk; installation of replacement concrete sidewalk; installation of new concrete curb; installation of replacement concrete curb.
Release
Sep 29, 2025
Close
Nov 20, 2025