City of Hayti
Work includes approx 25,700 LF of 6" SDR-21 PVC with locator tape, wire and blocking; 1,700 SY repair and replace asphalt; 1 LS 6" check valve replacement; 3 EA 6" hydrant assembly; 240 LF of 10" steel encased road bore with carrier pipe, spacers and end seals. See outside link.
Release
Aug 12, 2024
Close
Sep 24, 2024