Harrah School District 7
Work includes BP #2a demolition, BP #3a building concrete, BP #4a masonry, BP #5a steel fabrication, BP #5a steel erection, BP #6a millwork and finish carpentry, BP #6b general trades, BP #7a roofing, sheet metal flashing & trim, BP #7b air barrier & joint sealants, BP #7c expansion joint covers, BP #8a hollow matal frames, hm-wood doors (material only), BP #8b storefront and glazing, BP #9a matal framing, drywall & ceilings, BP #9b resilient tile, carpet and base, wood, BP #9c painting, BP #10a specialties, BP #10b signage, BP #10c lockers bid package #12a window blinds, BP #21a fire suppression, BP #22a plumbing, BP #23a HVAC, BP #26a electrical & fire alarm, BP #31a earthwork, BP #26a paving, BP #26a utilities.
Release
Mar 19, 2025
Close
Apr 10, 2025