Dept of the Army, Army Contracting Command, MICC
The scope of this project will include the renovation of a ~2,253 S.F. space within the Harney Gym Sports Complex. Spaces to be demolished/modified consist of an existing restroom, laundry room, telecom room, janitors’ closet, and storage closet. The new floor plan includes a 12-person conference/break room, 2 family restrooms (1 ABA compliant), lounge area, vending machine area, laundry room, telecom room, and corridors. The renovation will include repair/replacement of electrical, lighting, telecom, mechanical, plumbing (including under-slab), ceilings, and all related finishes; alteration of both fire notification and detection systems; demolition of some load-bearing and non-load-bearing walls, concrete flooring, ceilings; and construction of structural lintels, non-load-bearing walls, doors, frames, and interior glazing “lites” in an existing 12” thick concrete wall.
Release
Jun 11, 2025
Close
Jul 08, 2025