Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Hancock County
Installation of additional timber spreader beams to the existing bridge, tightening of existing bolts throughout, installation of new bolts on existing beams, mill and resurface of 30 ft off each end of bridge, installation of Type III waterproofing membrane, installing a new asphalt overlay on the bridge deck; and all incidental work required.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Old Bridge Township Public Schools
Pedestrian bridge repairs.
Posted Date
Oct 14, 2025
Due Date
Dec 12, 2025
Release: Oct 14, 2025
Old Bridge Township Public Schools
Close: Dec 12, 2025
Pedestrian bridge repairs.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Holt County
Work includes demolition of an existing bridge and the construction of a new 99-foot single span prestressed concrete NU girder bridge. Guardrail, riprap, and permanent erosion control will be installed along with any other incidental work.
Posted Date
Nov 26, 2025
Due Date
Dec 29, 2025
Release: Nov 26, 2025
Holt County
Close: Dec 29, 2025
Work includes demolition of an existing bridge and the construction of a new 99-foot single span prestressed concrete NU girder bridge. Guardrail, riprap, and permanent erosion control will be installed along with any other incidental work.
AvailableBurlington County Bridge Commission
Concrete and steel repairs for the tacony-palmyra bridge.
Posted Date
Nov 21, 2025
Due Date
Jan 6, 2026
Release: Nov 21, 2025
Burlington County Bridge Commission
Close: Jan 6, 2026
Concrete and steel repairs for the tacony-palmyra bridge.
AvailableNational Guard Bureau (NGB)
Provide bridge repairs and resurfacing.
Posted Date
-
Due Date
Dec 12, 2025
National Guard Bureau (NGB)
Close: Dec 12, 2025
Provide bridge repairs and resurfacing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →