Hallstead Great Bend Joint Sewer Authority
Demolition of existing plate filter press, sludge holding tank, and chemical feed tank with containment and installation of a Screw Press, reaction tank, polymer injection skid, platform, and two (2) sludge pumps in series along with piping and other appurtenances.
Hallstead-Great Bend Sewer Authority, Susquehanna County - p
zip
Town of Bailey
Sanitary Sewer Improvements DWI Project - Contract No. 21 – Sanitary Sewer Improvements.
Washington County Authority
Provide washington sewer improvements.
Liverpool Municipal (Water And Sewer) Authority
CIPP lining of approx. 3,285 LF of 8" diameter and 785 LF of 10" diameter gravity sanitary sewer main; the reinstatement of 50 laterals; rehabilitation of 13 sanitary sewer manholes; replacement of approx. 183 LF of 8" diameter and 273 LF of 10" diameter gravity sanitary sewer main; reconnection of approx. 5 sanitary sewer laterals; 6 reconnections to existing manholes; abandoning 4 exterior manhole drops; installing 5 interior manhole drops; surface restoration; and all other work identified in the Contract Documents.