Wisconsin Department of Transportation
Work includes : 12,564 SY removing concrete pavement; 285,943 SF removing concrete surface partial depth; 206,154 SY removing asphaltic surface milling; 1,076 LF removing curb & gutter; 19,070 CY excavation common; 1,427 CY base patching concrete shes; 516 SY concrete pavement 6"; 16,739 ea drilled dowel bars; see attached file.
Release
Sep 03, 2024
Close
Oct 08, 2024