Orange County Water District
Construction of two separate pressurized water treatment projects within the past 10 years such as, but not limited to, granular activated carbon, ion exchange, surge tanks, membrane filtration, and/or pressurized filtration. Take delivery and install district furnished pressure vessel systems, bag filter, and ion exchange resin media at the water treatment plant including pressure testing, disinfection, and bacteria testing. Furnish and install or construct well pump and piping, air gap, grading, paving, concrete, piping, driveway, wall and fence improvements, etc. For the pfas water treatment plant. Electrical and instrumentation: electrical equipment and facilities, and instrumentation equipment and facilities at the new water treatment plant. Instrumentation and control systems shall be integrated with the existing scada system.
Release
May 22, 2025
Close
Jun 25, 2025