Ohio Department of Natural Resources
Replace roughly 450ft of 2-IN pipe from the meter to the maintenance building; bore the line in and connect to the meter set and house line at the building; post installation, test line per code to ensure no leaks; back fill holes to a rough grade to allow settling. Vendor responsible for demo, haul away, site clean-up.
Release
Nov 21, 2024
Close
Dec 09, 2024