Township of Pennsauken
Project work includes roadway improvements to the various mentioned roadways in the township.
City of Hackensack
Construction of new corner curb extensions, selective reconstruction of concrete sidewalks, ADA curb ramp construction, relocation and installation of signage, drainage improvements, pavement restriping, and selective milling and paving at the intersection.
Village of Nyack
Drainage Improvements. The scope of work for the project includes the construction of drainage improvements, including pipe, catch basins and manholes, on High Avenue and continuing south onto N Franklin Street. Concrete curb and concrete driveway aprons will be removed and replaced, and the road will be milled and paved. The limits will be marked in the field. The approximate scope of work for the major items for the Base Bid for this project includes 1230 LF 24-inch HDPE, 48 LF 19 x 30 elliptical pipe, 60 LF 15 inch HDPE, 6 catch basins, 1 manholes, 1050 LF concrete curb, 168 SY concrete driveway apron, 4245 SY milling, variable depth, leveling, 500 TONS paving, 2 inch thick top course, and pavements markings and striping and other associated work as needed for a complete, in place project. Traffic control will be performed by Village staff. The scope of work for the project includes the construction of drainage improvements, including pipe, catch basins and manholes, on High Avenue and continuing south onto N Franklin Street. Concrete curb and concrete driveway aprons will be removed and replaced, and the road will be milled and paved. The limits will be marked in the field. The approximate scope of work for the major items for the Base Bid for this project includes 1230 LF 24-inch HDPE, 48 LF 19 x 30 elliptical pipe, 60 LF 15 inch HDPE, 6 catch basins, 1 manholes, 1050 LF concrete curb, 168 SY concrete driveway apron, 4245 SY milling, variable depth, leveling, 500 TONS paving, 2 inch thick top course, and pavements markings and striping and other associated work as needed for a complete, in place project. Traffic control will be performed by Village staff. The scope of work for the project includes the construction of drainage improvements, including pipe, catch basins and manholes, on High Avenue and continuing south onto N Franklin Street. Concrete curb and concrete driveway aprons will be removed and replaced, and the road will be milled and paved. The limits will be marked in the field. The approximate scope of work for the major items for the Base Bid for this project includes 1230 LF 24-inch HDPE, 48 LF 19 x 30 elliptical pipe, 60 LF 15 inch HDPE, 6 catch basins, 1 manholes, 1050 LF concrete curb, 168 SY concrete driveway apron, 4245 SY milling, variable depth, leveling, 500 TONS paving, 2 inch thick top course, and pavements markings and striping and other associated work as needed for a complete, in place project. Traffic control will be performed by Village staff.
City of Asbury Park
Project includes reconstruction of the roadway, construction and replacement of concrete curb and sidewalk, ADA upgrades, and replacement of drainage and sanitary sewer infrastructure on portions of Third Avenue, as well as all other Work.
Release
Oct 24, 2025
Close
Nov 13, 2025