City of Simi Valley
Work includes 152,401 SF cold milling - 2 1/2" full width; 8 CY install class ii aggregate base; 638 SF sawcut, remove and reconstruct existing pcc sidewalk per sppwc 112-2 and 113-2; 11 LF sawcut, remove and reconstruct existing pcc club and gutter per sppwc standard plan no. 120-3, type a2-6, w=18"; 42 LF grind existing pcc sidewalk at the lifted joint; 2,450 ton construct 2 1/2" type iii-b2-pg 70-10 surface course; 3 EA adjust to grade storm drain manhole; 16 EA remove, dispose, and replace water valve box, cover, and riser; 14 EA remove, dispose, and replace sewer manhole frame, ring, and cover; 1 EA adjust to grade survey monument; 4 EA a) install blue reflective fire hydrant marker. See attached file.
FY 2023-24 Annual Major Streets Rehabilitation Program: Erringer Road (Alamo to Cochran Street)
zip
Release
Feb 20, 2025
Close
Mar 20, 2025