Retrieving RFP details
Release
Close
Onondaga County
Furnishing pump station comminutor.
Town of Westerly
Seeking bid proposals from qualified contractors to design and construct flood resiliency walls to protect the margin street pump station from potential 100-year flood waters. See attached file.
City of Gardner
Work includes of all work associated with upgrading the existing water booster pump station including all electrical, mechanical, hvac, scada, telemetry, and instrumentation work. Other work shall include site work, generator installation, and miscellaneous building modifications.
City of Durango
Generally consist of furnishing and installing a factory-built booster pump station, salvage of the existing factory pump station for future city use, furnishing and installing a backup generator, installing new pipelines with connections to the pump station and the existing waterlines, installation of two (2) gate valves, abandonment of the existing pipelines, installation of security fencing, extending and installing communication and electrical conduits, installing an electrical panel array, and restoring existing surface conditions. The pump station can only be shut down for a maximum of 5 hours during the switch from the existing pump station to the new pump station
Release
Oct 29, 2025
Close
Nov 20, 2025